North America: electrical supervisor
David Buskirk, electrical supervisor at the High Lonesome wind farm (during construction), Texas. The photo was taken in August 2019.
The photo was taken during the period prior to the Coronavirus (Covid-19) emergency.
Image size and file type
5475 x 3652
JPG (5.06MB)